How much of my project will the lender finance?
For qualified projects, up to 90% of cost for horizontal land development and vertical construction. That fits best when you already own the land, have paid the soft costs, and have plans, permits and bids ready to start.
Buying land and early development usually take more of your money, typically 35% to 40% down. A complete plan that covers acquisition, development and construction together may lower that by about five points.
The lender also checks value, generally 70% to 75% of the appraised value, and lends on whichever number is more conservative. You will also need cash available beyond your equity in the deal.
How do construction draws work?
Draws reimburse completed work. You or your general contractor pay the subs and suppliers, then request a draw for work that is finished and verified, not for materials on order or work scheduled. Plan your working capital for the time between draws.
Plumbing, HVAC and electrical are typically reimbursed at approved stages backed by inspections and green tags. Big infrastructure, such as roads, generally has to reach its completed stage first. A complete draw package includes:
- An itemized draw request and the invoices
- Proof the work is complete
- Inspection reports or green tags
- Proof of payment
- Lien releases
With a complete package, funding typically takes about five business days, including review and inspection. Funds go to you or your general contractor, who pays the subs.
Can one lending relationship cover the whole project?
Yes, and that is the point. The same relationship can coordinate land, development, construction and the long-term loan at the end: a rental (DSCR) loan if you keep the homes, or mortgages for your buyers if you sell them.
In return, the lending team asks to be your preferred lender and to get a real chance at that final financing. Plan the exit from day one so the construction loan and the final loan fit together. Each loan still goes through its own underwriting.